Vital Information - Nokor Tep Women’s Hospital

Registration - Ministry of Interior:  #1512សជណ – July 18 2011 – Official NGO
Approval of Prime Minster Samdech Hun Sen: #735សជណ – July 10,2012
Registration - Ministry of Health:     MOU Agreement – June 19, 2013
Construction Permit:  #183ដនស/អដន December 12, 2013
Building Inauguration Date:   18 March 2019
Official Opening Date:   04 June 2019
Location: #109 Path Road, Prey Sor East Village, Prey Sor Commune, Dangkor District, Phnom Penh, Cambodia

                      Please refer to this map

 

8.    Establishment Size:

•    Land Size:                1.5 hectares (Long Term Lease secured)
•    No. of Floors:          5 floors (Basement + Four Floors)
•    Building Floor area : 24,000 square meters

•    Patient Beds:

                         •    Phase 1: out-patient department only

                         •    Phase 2 : 40-100 patient beds

                         •    Full Capacity: 180 patient beds

•    Medical Staffing:

    - Phase 1: 7 medical doctors and specialists, 6 midwives and nurses

    - Phase 2: 15 medical doctors and specialists, 10 midwives and nurses

    - Full capacity: 28 full-time medical doctors and specialists

 

 

9.    Estimated at Full Capacity:

•    42 new in-patient per day
•    450 examinations per day

•    1505 cancer patients treated per annum

 

About the Medical Institution:

Phase 1 Phase 2
  • - Consultation rooms (28 units)
  • - Laboratory
  • - Pharmacy
  • - Emergency Room
  • - Minor Procedure Room for Gynecology (1 unit)
  • - Palliative Care Units
  • - Educational Rooms: Mother Classes, etc
  • - Imaging Department (Ultrasound, X-Ray, Mammogram, CT-Scan
  • - Administrative Officers
  • - Meeting Rooms (2 units)
  • - General Minor Procedure Room (1 unit)
  • - Maternity Department: 6 Delivery Rooms
  • - Surgery Department: 4 Operating Rooms
  • - Adult and Neonatal ICU (NICU Level 1)
  • - Training Rooms (2 units)
  • - Canteen Area 

 

 

 

Phase 3

Phase 4

  • - Oncology Department
  • - Radiology Department 
  • - Mobile Clinic (for medical outreach)
  • - Imaging Department (Addition of an MRI)

 

11.    Cost of Hospital Building: US$7.3 million ( Close to US$ 6.5 million already secured and spent)

12.    Cost of Outfitting:  US$14 million

13.    Current status of construction:

        Planning Phase: COMPLETED

•    Project Plans
•    Architectural Sketches
•    Detailed Drawings: Mechanical, Engineering, Structural, Electrical Detailed Plans

Construction: Foundation - COMPLETED

•    Pouring of concrete and support pillars for all 5 floors: Basement Floor, Ground Floor, First Floor, Second Floor, Third Floor, and Fourth Floor
•    Raising and painting the walls inside the building
•    Setting window frames and placing the windows on all floors
•    Complete the rooftop
•    Parking area and Front Lawn

Building Support Structure: Phase 1: COMPLETED, Phase 2: IN THE WORKS

•    Installation of Sewers and Drainage Systems
•    Septic Tanks and Water catchment Tanks
•    UPS and Fuel Generator installed and connected to support the entire hospital
•    Solar Panels - Phase 2 on the rooftop ( pending 2021 )
•    Major Power lines and water system in the building set-up

•    Basement and ground floor have electrical power, water and IT system fully installed
•    Setting up the electrical power, water and IT system for the Second Floor
•    Setting up the gas system on the Ground Floor ( emergency room, minor procedure rooms, recovery rooms ) and the Second Floor (Surgery department, maternity department and patient rooms)
•    Setting up electrical power, water and IT system for the First Floor

Building Support Structure: Phase 1: COMPLETED, Phase 2: IN THE WORKS


•    Setting up the outpatient department including consultation rooms, the laboratory, the pharmacy, the finance office and administrative officers.
•    Setting up the emergency room and palliative car units (2 units)
•    Outfitting the minor gynecology procedure room (1 unit) and recovery rooms (2 units)
•    Outfitting the minor general surgery room (1 unit) and recovery room (2 units)
•    Outfitting the surgery department (2 surgery rooms), maternity department (4 delivery rooms), intensive care units of adults and newborns, and patient rooms.


14   Financial Accountability - Audits done in July/August of each year by Barachina Consulting Co. Ltd.

Newsletter

Be updated with the struggle of the women of Cambodia, subscribe to our newsletter

Contact us

No. 109 Path Road, Prey Sor East Village, Prey Sor Commune, Dangkor District, Phnom Penh, Cambodia

  • Tel: 023 231 590/ 023 231 596/ 081 231 590/ 088 279 5050